Need an Electrician Before Starting a Kitchen Renovation?
DO YOU KNOW WE ALSO HAVE 25 FULLY QUALIFIED PLUMBERS !!!
Yes — if your kitchen renovation involves moving appliances, changing sockets, installing new lighting, adding an induction hob or making other electrical changes, it is best to involve an electrician before the new kitchen is installed.
Ideally, your kitchen layout and main appliances should be broadly decided first. Your electrician can then assess where power is needed and complete any required wiring while walls and electrical routes are still accessible.
Waiting until the cabinets, worktops and finished walls are already in place can make relatively straightforward electrical changes much more difficult.
Quick Answer
For most substantial kitchen renovations, speak to your electrician once you know:
Where the kitchen units will go
Where the oven and hob will be positioned
Whether you are using gas, electric or induction cooking
Where the fridge, dishwasher and other appliances will sit
Whether there will be a kitchen island or peninsula
Where you want worktop sockets
What lighting you want
Whether any walls are being moved or opened
The electrical work can then be planned around the finished kitchen rather than trying to adapt the kitchen around existing electrical points.

Why Should the electrician before kitchen renovation Be Involved Before the Kitchen Is Fitted?
A kitchen contains considerably more fixed electrical equipment than many other rooms in a house.
You may have:
Oven
Electric or induction hob
Extractor fan
Fridge/freezer
Dishwasher
Washing machine
Tumble dryer
Microwave
Kettle
Toaster
Coffee machine
Air fryer
Under-cabinet lighting
Pendant lighting
Worktop sockets
Kitchen island sockets
The electrical requirements therefore need to match the actual kitchen design.
Imagine installing your new cabinets and then discovering that the socket for the dishwasher is in the wrong place, there is no suitable supply for the new hob or you need another electrical point behind an already-fitted unit.
That is exactly the type of unnecessary disruption that early electrical planning can help avoid.
What Electrical Work Should You Plan Before a Kitchen Renovation?
You don't necessarily need to know the technical solution yourself.
What you should know is how you intend to use the kitchen.
Your electrician can assess the electrical requirements from there.
1. Kitchen Socket Positions
One of the first things to think about is how many sockets you actually need and where you will use them.
Consider appliances that may regularly sit on your worktop:
Kettle
Toaster
Coffee machine
Air fryer
Blender
Food processor
Phone charger
Other small appliances
Look at your finished kitchen drawing rather than the existing room.
An existing socket may look perfectly positioned today but end up behind a tall cabinet, inside an inaccessible area or nowhere near the new worktop.
If additional or relocated sockets are required, they are much easier to plan before the kitchen is finished.
2. Oven and Hob Connections
Your new oven or hob may not have the same electrical requirements as the appliance it replaces.
This is particularly important if you are:
Moving the cooker position
Installing a larger oven
Adding separate ovens
Changing from gas cooking to electric
Changing to an induction hob
Installing new integrated appliances
Do not assume that because the existing cooker worked, the existing electrical arrangement will automatically be appropriate for the replacement.
The appliance specification and existing installation should be considered before the connection is planned.
Are You Switching From Gas to an Induction Hob?
This deserves particular attention during planning.
Changing from a gas hob to induction is not simply a case of removing the gas hob and plugging in the new one.
The electrical requirements of the chosen induction hob need to be considered alongside the existing electrical installation and available supply.
That can affect the wiring and electrical work required.
If induction is part of your new kitchen design, choose the appliance early enough for its electrical requirements to be checked before the kitchen is fitted.
We will cover this subject in more detail in our dedicated guide to switching from gas to induction.
3. Kitchen Lighting
Kitchen lighting is another area that is much easier to plan before the room is finished.
You might want:
Ceiling lights
LED downlights
Pendant lights over an island
Under-cabinet lighting
Lighting above work surfaces
Feature lighting
Separate lighting zones
Dimmer controls where appropriate
Think about what each light is actually supposed to do.
A pendant over an island may be decorative, while lighting underneath cabinets can make food-preparation areas more practical.
The locations of kitchen units, worktops and islands can all affect where lighting points should be positioned.
4. Integrated Appliances
Integrated kitchens can look very clean because much of the equipment is hidden behind cabinetry.
But the electrical connections still need to remain properly planned.
Before installation, identify the intended position of:
Dishwasher
Integrated fridge/freezer
Oven
Microwave
Extractor
Washing machine
Tumble dryer
Other fixed electrical equipment
Your electrician can then assess how each appliance should be supplied and how the electrical points should be arranged.
Avoid deciding electrical positions based only on where the old appliances were.
Your new kitchen layout should drive the plan.
5. Kitchen Islands and Peninsulas
Adding an island can completely change how a kitchen is used.
You may want electricity for:
An induction hob
Worktop sockets
Pendant lighting above the island
Integrated appliances
Charging points
Other electrical equipment
However, getting power to an island can be different from adding another point to a normal kitchen wall.
The electrical route needs to be considered before the finished floor, island and surrounding kitchen are completed.
If you know an island is going into the kitchen, include its electrical requirements in the original plan rather than treating them as an addition later.

Will My Fuse Board Need to Be Upgraded for a New Kitchen?
Not necessarily.
Installing a new kitchen does not automatically mean that your fuse board needs replacing.
However, a renovation can be a sensible time to assess the existing electrical installation, particularly where substantial new electrical equipment or circuits are being introduced.
The electrician may consider things such as:
Existing protective devices
Available capacity
Existing circuit arrangements
Condition of the installation
Proposed new electrical equipment
Whether new circuits are required
Whether the existing board is suitable for the planned work
If the existing fuse board is appropriate, there may be no reason to replace it simply because the kitchen is being renovated.
If limitations or problems are identified, the electrician can explain what work is actually required.
Does a Kitchen Renovation Mean I Need a House Rewire?
No.
A kitchen renovation does not automatically mean that your entire house needs rewiring.
In many properties, the electrical changes may be limited to the kitchen.
However, older wiring, unsuitable existing circuits or problems discovered during the renovation may mean that more extensive work needs to be considered.
That might involve upgrading part of the electrical installation rather than rewiring the entire property.
If wider concerns are found, they should be assessed properly rather than assuming either that everything needs replacing or that the existing wiring must be fine because it currently works.
When Should the Electrician Come During a Kitchen Renovation?
There can be more than one electrical stage.
Stage 1: Planning
Before work starts, agree the main kitchen layout, appliance positions, sockets and lighting.
This allows the electrician to understand what the finished kitchen needs.
Stage 2: First Fix
Where wiring needs to be installed, moved or altered, much of this work is normally easier while the room is stripped out and the relevant areas are accessible.
Cables and electrical points can be positioned before everything is covered by finished walls, cabinetry and other surfaces.
Stage 3: Second Fix and Connections
Once the kitchen has progressed sufficiently, sockets, switches, lighting and appropriate electrical equipment can be fitted or connected.
Stage 4: Testing and Completion
The relevant electrical work should be appropriately inspected and tested when completed.
The exact sequence will depend on the renovation, so your electrician and kitchen fitter should coordinate their work rather than treating each stage separately.
What Should I Give My Electrician Before the Work Starts?
You do not need to prepare an electrical drawing yourself.
But providing good information can make planning considerably easier.
If available, send your electrician:
Kitchen floor plan
Cabinet drawing
Appliance locations
Appliance specifications
Hob type
Oven details
Kitchen island dimensions
Proposed socket positions
Proposed lighting layout
Details of walls being removed or changed
Photos of the existing kitchen
Photo of the existing fuse board
Even a clear kitchen supplier's drawing can make a big difference.
The goal is simple:
Plan the electrics around the kitchen you are building — not the kitchen you are removing.
Should I Let the Kitchen Fitter Handle the Electrical Work?
Kitchen fitters and electricians often work alongside each other, but electrical work should be handled by the appropriate electrical contractor.
In Ireland, homeowners should use a Safe Electric Registered Electrical Contractor (REC) for electrical work in the home.
Many domestic electrical works are Restricted Electrical Works and are subject to Ireland's electrical safety regulatory system.
Where certification is required for the work carried out, the appropriate certification should also be provided.
So before agreeing to a complete kitchen-renovation package, ask who will actually be carrying out the electrical work.
Kitchen Renovation Electrical Checklist
Before your new kitchen goes in, check that you have considered:
Kitchen layout finalised
Main appliances selected
Oven position confirmed
Hob type and position confirmed
Fridge/freezer position confirmed
Dishwasher position confirmed
Washing machine/tumble dryer position confirmed if applicable
Worktop sockets planned
Island electrical requirements planned
Lighting positions planned
Under-cabinet lighting considered
Extractor requirements considered
Existing electrical installation assessed where necessary
Fuse board suitability considered where relevant
Electrician and kitchen fitter working from the same layout
You do not necessarily need every small design detail finalised before contacting an electrician.
But the earlier the main electrical requirements are considered, the easier it is to integrate them into the renovation.

Frequently Asked Questions
How early should I contact an electrician for a kitchen renovation?
Once you have a reasonably clear kitchen layout and know where the main appliances will be positioned, it is a good time to involve your electrician.
Do not wait until all the cabinets and finished surfaces have already been installed if electrical points need to be moved or added.
Do I need an electrician if I am only replacing my kitchen units?
Possibly.
If every electrical point and appliance remains exactly where it is and no electrical alterations are required, the scope may be limited.
However, if sockets, lights, appliances or electrical connections are being moved, replaced or added, speak to an electrician before installation.
Can sockets be moved during a kitchen renovation?
Where the existing electrical installation and proposed location are suitable, sockets can often be moved or additional electrical points installed.
The electrician should assess the existing circuit, wiring and new location before deciding what work is appropriate.
Do I need a new electrical circuit for an induction hob?
It depends on the appliance and the existing electrical installation.
Induction hobs can have significant electrical requirements, so the specifications of the chosen appliance and the existing supply need to be assessed.
Do not assume the electrical connection used for your previous cooker or hob will automatically be suitable.
Should I upgrade my fuse board before installing a new kitchen?
Not automatically.
The condition and suitability of your existing fuse board should determine whether work is required.
If your kitchen renovation involves significant electrical changes, your electrician can assess the board alongside the proposed work.
Can I add more sockets after the kitchen has been installed?
Sometimes, yes.
However, access and cable routing can be considerably easier before kitchen units, splashbacks and finished surfaces are in place.
Planning your sockets before installation usually gives you more flexibility.
Does an old kitchen mean the house needs rewiring?
No.
The age of the kitchen alone does not determine whether your house needs rewiring.
The condition and suitability of the actual electrical installation need to be assessed.
Planning a Kitchen Renovation in Dublin?
If you are planning a new kitchen and are unsure what electrical work will be required, it is worth checking before the kitchen is installed.
Stillorgan Electrical Services can assess your proposed kitchen layout, existing electrical installation and the electrical requirements of your new appliances, sockets and lighting.
We can then explain what electrical work is actually required for the project.
Stillorgan Electrical Services Safe Electric Registered Electrical ContractorServing homes across Dublin





Comments